Handover and close out
NB The 2020 edition of the RIBA Plan of Work has renamed this stage 'Handover'.
The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages). As a result, it is important that appointment documents make it clear explicitly what activities fall within which stage, and what level of detail is required, rather than relying on rather vague stage names.
‘Handover and Close Out’ was a new phrase coined by the Royal Institute of British Architects (RIBA) for the 2013 Plan of Work. This plan comprised eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.
- 0 - Strategic definition.
- 1 - Preparation and brief.
- 2 - Concept design.
- 3 - Developed design.
- 4 - Technical design.
- 5 - Construction.
- 6 - Handover and close out.
- 7 - In use.
The RIBA states that Stage 6, Handover and Close Out maps broadly to the former Stage L: Post Practical Completion.
They describe the activities carried out during the stage as, ‘handover of building and conclusion of building contract’ including updating ‘as constructed’ information, commissioning, training and perhaps post-occupancy evaluation following the ‘soft landings’ process. Presumably the stage also includes tasks associated with the defects liability period and issuing the final certificate, although these are not described.
Previously, this stage might have been described as the ‘defects liability period’, the period which begins on certification of practical completion at the end of the construction stage and typically lasts six to twelve months, during which the client takes possession of the site, defects are rectified and then the final certificate issued. This is perhaps a better description of the stage and in the Designing Buildings Wiki project plans, we describe this stage as the ‘occupation and defects liability period’
The 2020 edition of the RIBA Plan of Work has renamed this stage 'Handover'.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- BREEAM Handover.
- Comparison of work stages.
- Creating an asset register for construction projects.
- Defects liability period.
- Designing Buildings Wiki Project plans.
- Developed design.
- Handover to client.
- Migration strategy.
- RIBA Plan of Work.
- Soft landings.
- Traditional contract: occupation and defects liability period.
[edit] External references
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..