Best value procurement in the construction industry
Contents |
[edit] Introduction
The best value procurement (BVP) approach is a method of purchasing construction works, services and so on. It considers criteria, such as quality, reliability and expertise, rather than just price to assess value.
[edit] History
This method was developed by the Performance Based Studies Research Group (PBSRG) in the United States (where it is most commonly used). It is also practised in the United Kingdom and the Netherlands, where it is referred to as ‘prestatie inkoop’ or performance procurement.
[edit] BVP or MEAT?
The idea behind best value procurement is to compare the long term costs and benefits associated with the vendor selection process. It is similar to the Most Economically Advantageous Tender (MEAT) principle, and both use assessment criteria such as:
- Quality.
- Price or cost using a cost-effectiveness approach.
- Technical merit.
- Aesthetic and functional characteristics.
- Accessibility.
- Social characteristics.
- Environmental characteristics.
- Innovative characteristics.
- After-sales service and technical assistance.
- Delivery conditions such as date, process and period.
In addition to MEAT criteria, best value procurement also assesses the potential for eliminating (or minimising) risk, so procurement decisions are made based on predictability. Best value procurement assigns weightings to each criteria - including reliability- and vendors or contractors are scored on each. Decisions are based on the final tally.
[edit] The process
There are four phases of the best value procurement process::
- Preparation.
- Selection.
- Clarification.
- Execution.
Being data driven, best value procurement simplifies the decision making process. This minimises the influence of vendors in the procurement process and maximises the power of the procurer.
[edit] Related articles on Designing Buildings
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.