The process of modular construction from design to completion
Contents |
[edit] Introduction
Even though off-site construction is generally a more simple process than traditional building, there can still be advantages to using a company which can support every step of the process. Turnkey services offer expert guidance from the first meeting to the last coat of paint.
[edit] Devising the concept and design
The first step in any project is determining what the customer wants. When choosing off-site construction, several factors can influence this decision. How many rooms are required? How high will the structure go – single storey or multiple floors? Where will the building be located?
Time should be taken to discuss these questions with customers and run through the options in initial meetings so that they can be certain that they have covered all the angles. From there, the plans can be put together and a quotation provided.
Customers should be kept informed throughout the process, and the use of building information modelling (BIM) allows customers to see what the finished product will look like before manufacturing begins.
The added advantage of this approach is that the final cost should not differ from the initial quote, helping customers to plan and control their expenditure.
[edit] Managing the planning process
A question asked repeatedly is whether or not planning permission and building regulations still apply to modular buildings. The answer is yes.
The first step is to liaise with the council’s planning officer and manage the full process, including submitting the plans in the correct format and ensuring they are complete.
From there, the next step is the building regulations application, which covers the functionality and structural performance of the building to ensure that it complies fully with requirements. The regulations look at the robustness and safety of the finished building as well as taking account of fire safety, drainage, potential for contamination, ventilation and so on.
[edit] Construction and installation run concurrently
Once planning permission is secured from the local authority, groundworks can begin on-site. Skilled tradespeople will dig foundations and liaise with utilities providers to ensure that all services connections are in place so that the final structure can be easily dropped into place.
The construction works begin at the same time in a specialist factory, where the building is assembled ready to be installed on-site. The final step in the process is dropping the finished building into place and connecting the utilities. Exterior cladding (which starts in the factory) is finished off on-site, as is plastering and painting.
[edit] How long is the modular construction process?
Using a company that can manage the design and construction process from start to finish is the most efficient way to ensure that a project is completed in a timely manner.
After the initial discussion, the quick generation of plans and a quotation puts the customer in position to start the planning process. This is where delays can occur: securing planning permission and building regulations approval can take anything from six weeks to three months depending on the local authority, so taking advantage of an experienced team which is well-versed in the process can be worthwhile.
The rest of the process can be relatively simple: the groundworks will run alongside the factory build, so within four to six weeks the structure will be ready to installed. As the time on site should take just a couple of weeks, the whole process can take no more than three or four months.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.