Secondary Ventilation Stacks in Tall Buildings
Contents |
[edit] Why are secondary drainage stacks required?
As increasing numbers of people work and live in city centres, the lack of space available for residential developments means that high-rise buildings are becoming more widespread.
When installing drainage and ventilation pipework in high-rise buildings, traditional design standards dictate that a secondary ventilation stack has to be used to overcome air pressure changes. This is to account for the positive and negative air fluctuations that can compromise water trap seals due to the unsteady flow of water through the pipework. Incorrect air balance can result in blowback and siphoning of the water seal in the trap, which could pose a public health risk.
To maintain stability in a drainage system, it is necessary to alleviate this change in air pressure immediately. This response time is paramount for protecting water trap seals, with traditional secondary pipework systems thought to be the only way to provide this function.
[edit] Considerations for designing drainage and ventilation
There are many factors to consider when installing secondary pipework systems, which continue to be the industry norm. For Instance, installing a secondary stack ventilation system requires more installation time and materials, and in turn takes up valuable floor space, a major factor when limited space is taken into consideration. With architects often designing buildings to a small footprint, particularly in city centres with limited space, the inclusion of a secondary stack can hinder the design process.
Rather than a secondary ventilation piping system, air regulatory and attenuator valves can be installed in high-rise buildings drainage stacks to balance negative and positive air pressure fluctuations.
There are potential savings to be made through the removal of secondary vented drainage systems. As less vents are required there is also a reduced requirement for floor penetration fire collars, something a secondary vent system would always require.
The removal of a secondary vent also reduces the drainage system footprint, meaning there is greater flexibility in the design of internal drainage systems. This increased flexibility means that building designs, and room layouts, are no longer dictated by strict pipework systems. This provides architects with more freedom to design buildings, without having to compromise. Building owners also have more useable, and consequently sellable space.
Secondary venting also proves to be a much less effective solution for very tall, or complicated, drainage systems as the time lag that occurs when communicating a change in ambient airflow in the pipework can result in an ill-performing drainage system. This would require expensive maintenance and repair throughout the life of the system.
[edit] Alternatives to secondary ventilation stacks
Products such as the Polypipe Terrain P.A.P.A® and Pleura valves are a proven alternative to traditional secondary vented drainage systems. The P.A.P.A® (positive air pressure attenuation) valve is designed to react to and attenuate positive pressure transience within the drainage stack of high-rise developments providing a suitable venting solution for any multi-storey building.
The Pleura valves are designed to allow air into the system when negative pressures are experienced. When these two valves are combined, the effects of positive pressure such as blown sink and WC traps and negative pressure siphoning traps are mitigated, thus removing the need for a traditional secondary vented pipework system.
The PAPA and Pleura valves have been tested in buildings up to 39 stories high and have BBA and LABC approval, making them a reliable option for designers, architects and installers.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.