If serious problems occur on site, immediate actions undertaken by an architect might include:
- Stop the work
- Ensure that the contractor has notified the employer
- Ensure that the contractor does not repair/do any work until the insurers/survey have/is carried out their investigation
- Notify the CDM co-ordinator
- Instruct the structural engineer to carry out a structural report
- Assess measures to be taken to restore the site to a safe condition
- Ask the quantity surveyor to go to site and value the damages
- Ensure that the contractor has disclosed all of the facts to the insurer
Contractual situation 1: Example - collapsed wall
- A full investigation must be carried out to determine who’s fault it was (eg design fault / contractors fault / specified peril such as a flood)
- Contact professional indemnity insurer to notify them of a circumstance that may lead to a claim
- Advise other consultants to do the same
- If the damage was caused by a specified peril, it will be covered by works insurance
- If it was a design fault, will be covered by PI insurance
Contractual situation 2: example - a fire
- The contractor will restore the damaged work, restore and repair any site materials damaged and proceed with carrying out the completion of the works
- The restoration of the loss or damage shall be treated as if it were a variation required by an architects instruction
- The contractor may be entitled to an extension of time and loss and/or expense
Contractual situation 3: example - archaeological items found
- All items found on site are the property of the employer
- The architect should contact the archaeology department of the borough or county council to inform them of the discovery and ask for advise.
- The architect shall issue instruction as to what is to be done, which may require that the contractor permit the examination, excavation and removal of the items by a third party
- The architect shall ascertain any entitlement the contractor has to loss and/or expense
[edit] Related articles on Designing Buildings Wiki
- Code of construction practice.
- Complaining about construction sites.
- Considerate Constructors Scheme.
- Damage caused by construction works.
- Environmental health.
- Environmental impact assessment.
- Health and safety inspector.
- Noise nuisance.
- Nuisance in construction.
- Quiet period.
- Site inspections.
- Site rules.
- What hours are construction sites allowed to operate?
Featured articles and news
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.