Porous
The word ‘porous’ refers to materials that include voids through which liquids or gasses may pass. Porosity is the volume of such voids relative to the overall volume of the material.
The SuDS Manual (C753), published by CIRIA in 2015 defines porosity as ‘The percentage of the bulk volume of a rock or soil that is occupied by voids, whether isolated or connected.’
A porous surface is: ‘A surface that infiltrates water to the sub-base across the entire surface of the material forming the surface, for example grass and gravel surfaces, porous concrete and porous asphalt.’
Porous asphalt is: ‘An asphalt material used to make pavement layers pervious, with open voids to allow water to pass through (previously known as pervious macadam).’
A porous pavement is: ‘A permeable surface that allows water to infiltrate across the entire surface material through voids that are integral to the pavement.’
NB Technical paper 35: Moisture measurement in the historic environment, published by Historic Environment Scotland in 2021, defines porosity as: ‘A measure of the total amount of void space in a material, usually expressed as a percentage (%).’
Assessing risks in insulation retrofits using hygrothermal software tools, Heat and moisture transport in internally insulated stone walls, by Joseph Little, Calina Ferraro and Beñat Arregi, published by Historic Environment Scotland in 2015, defines porosity as the: ‘Fraction of airspace within a material, often expressed as cubic metres of air per cubic metre of material (m3/m3) or a percentage of the total volume which is composed of air.’
[edit] Related articles on Designing Buildings
Featured articles and news
Not buildings. Happy holiday from DB.
Future Homes Standard: Industry calls for more ambition
As the Government FHS consultation finally closes.
Improving government projects with data and AI
Enabling better outcomes, efficient modern delivery and influential leadership on government projects.
BSRIA Living Laboratory Innovation Challenge
Final days for submission, closing March 29.
Windows, their frames, forms, factors and functions.
The hidden subtleties of U-Value calculations
Different contexts and what to include as variables.
A brief run down with related articles.
Electrical sector calls for safer public EV charge points
Serious concerns about electrical safety in the public domain.
Building Blocks manifesto presented to parliament
Architects Declare call in for support of five critical policies.
The four elements of project management with APM
Analysis, expectations, collaborative communication and partnerships.
City of London launches Heritage Building Retrofit Toolkit
Empowering owners to initiate necessary adaptations.
Guidance on RAAC in listed buildings
Published by Purcell, endorsed by IHBC, SPAB and C20.
Learning from the past.
Reluctance to hire people with criminal convictions revealed
Employing People with Criminal Convictions Report.
Tackling unconscious bias; Women's History Month
Personal reflections, as the last week of March approaches.