Kaohsiung Station, Taiwan
In July 2016, the Netherlands-based firm Mecanoo Architecten unveiled plans for a new Kaohsiung Station in Taiwan. It is to be the centrepiece of the vast Kaohsiung Metropolitan Area Underground Railway Project, a transportation hub which includes seven subterranean stations along a 9.75 km railway tunnel.
The 8.5 hectare site includes 13,000 sq. m of sunken station plaza, as well as a 35,000 sq. m 'green canopy' designed to add valuable public space and activate the local community.
Adopting the tradition of lanterns that light the main square in front of temples, where the most important events in Taiwanese villages take place, Kaohsiung Station's central hall is a sunken plaza that unfolds underneath a bright ceiling of oval-shaped lights. The immersive space will create a memorable experience for travellers.
The large curvilinear canopy acts as a 'green connector', unifying bus, bike and train transport, and representing Kaohsiung's mission to become a sustainable city. It protects the open public plaza underneath from Kaohsiung's tropical climate in the same way as large trees.
The green space will become a meeting place, a site for events or markets. Designed as a destination rather than merely an efficient mobility hub, the station's canopy connects a hotel, commercial building, shops, restaurants and other facilities.
The colonial Japanese station building, which will be relocated, is embraced by the canopy and symbolically reconnects the old and new Kaohsiung.
The station is expected to be completed by 2024.
Images and content courtesy of Mecanoo Architecten.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Building trust with customers through endorsed trades
Commitment to quality demonstrated through government endorsed scheme.
New guidance for preparing structural submissions for Gateways 2 and 3
Published by the The Institution of Structural Engineers.
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.