Integrated project delivery (IPD)
Integrated project delivery (IPD) is a project delivery model built around a collaborative alliance of stakeholders who each share risk and reward. It involves the key project stakeholders (the client, architect, contractor, and so on) entering into a single contract that encourages collaboration, optimises results, reduces waste and maximises efficiency and expertise.
The stakeholders collectively determine project goals, budgets, allocation of risk and compensation. The contract typically specifies the separate responsibilities of the stakeholders but enshrines collective responsibility for the project’s successful delivery.
The IPD contract agreement is typically signed by a ‘leadership team’ comprising the client, lead designer/architect and contractor. They are primarily responsible for delivering the project to the budget, schedule and quality specified by the client. Subcontractors and other stakeholders may agree to become ‘risk/reward partners’ (or they can be contracted on conventional sub-contract agreements).
Risk/reward partners agree to be reimbursed on a cost plus overhead and profit basis if the project performs well. The profit is fixed as a lump sum amount at the point at which the contract amount is negotiated and agreed by the stakeholders. The risk/reward partners may lose some or all of their profit if the project falls behind the budget or schedule, and the contract will lay out the terms of this loss. It is usual for the client to agree to pay for the project at cost if all profit is lost, thereby allowing stakeholders to limit their losses purely to the profit they would otherwise have earned on the project.
The benefit of the IPD method is that the contract removes barriers to collaboration and innovation, combining incentives for the project team as a whole rather than having them seek increased profits from the project individually. Instead of individual successes or failures, the overall outcomes determine the collective rewards.
By openly sharing the project goals, risk and rewards, this can result in a more dependable flow of information between the main parties, leading to a sharing of knowledge and technology. In addition, the project can benefit from being able to adopt lean construction principles, overlapping design and construction phases, and so on.
[edit] Related articles on Designing Buildings
- Collaborative practices.
- Consortium.
- Construction contract.
- Construction manager at-risk.
- Construction management contract.
- Construction project.
- Design and build.
- Integrated project insurance (IPI) model
- Integrated project team.
- Integrated supply team.
- Just-in-time manufacturing.
- Joint venture.
- Kanban.
- Lean construction.
- Managing the procurement process.
- Partnership.
- Procurement route.
- Tender process.
Featured articles and news
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.