Installed capacity refers to the maximum output that a system, typically related to energy generation or consumption, can produce under optimal conditions. This is commonly used in reference to renewable energy installations (such as solar panels or heat pumps), combined heat and power (CHP) systems, or battery storage capacity within a building:
- Solar Panels (Photovoltaics - PV): Installed capacity refers to the total peak output (in kilowatts, kW or megawatts, MW) of all solar panels on a building when operating under ideal sunlight conditions.
- Heat Pumps: The installed capacity of an air-source or ground-source heat pump indicates its maximum heating or cooling output in kilowatts (kW).
- Battery Storage: For buildings with energy storage, installed capacity refers to the maximum charge/discharge rate or total energy storage (typically in kilowatt-hours, kWh).
- Combined Heat and Power (CHP) Units: The installed capacity of a CHP system represents its maximum electrical and thermal power output, usually measured in kW or MW.
Energy Performance Certificates (EPCs) and Building Regulations may reference installed capacity when assessing energy efficiency. Feed-in Tariffs (FITs) and Smart Export Guarantee (SEG) schemes use installed capacity to determine eligibility and payments for energy generation. Larger installations may require approval based on their installed capacity and potential grid impact.
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.