Installed capacity of a fixed building service per unit area
Installed capacity refers to the maximum output that a system, typically related to energy generation or consumption, can produce under optimal conditions. This is commonly used in reference to renewable energy installations (such as solar panels or heat pumps), combined heat and power (CHP) systems, or battery storage capacity within a building.
Approved document L, Conservation of Fuel and Power, Volume 2: Buildings other than dwellings, 2021 edition incorporating 2023 amendments, defines the installed capacity of a fixed building service per unit area as: ‘The design output of the distribution system output devices (the terminal units) serving the space in question, divided by the total useful floor area of that space.’
See also: Installed capacity.
[edit] Related articles on Designing Buildings
- Approved document L.
- Approved documents.
- Building regulations.
- Energy.
- Fuel.
- Heating.
- Hot water.
- Installed capacity.
- Power.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
















