Hudson Yards: Manhattan
• Axonometric: Hudson Yards, Manhattan. Illustration courtesy of Jason Lee, Real Estate Agent. [1]
- "Hudson Yards is a 28-acre real estate development in the Hudson Yards neighborhood in Manhattan, New York City, between the Chelsea and Hell's Kitchen neighborhoods. It is located on the waterfront of the Hudson River." Wikipedia
[edit] INTRODUCTION
This article is a pictorial survey of Hudson Yards in Manhattan.
It uses a film by Miles Zhang to illustrate the growth of Manhattan and a selection of photographs to illustrate the new buildings.
It ends with a plea from Elizabeth Diller for public space.
[edit] • Pre-history Mannahatta
|
• Animated gif contrasting the landscape of Manhattan with Mannahatta [2] |
[edit] • 1609-2019 From Mannahatta to Manhattan
On October 25, 2018, Miles Zheig released a film entitled 'Here Grows New York' which illustrates the growth of Manhattan from 1609 to 2019. [3]
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
• Table 1: Thumbnails of selected frames from Miles Zhang's film outlining the chronological development of Manhattan, New York City - click to enlarge.
[edit] • Hudson Yards
Table 2 below illustrates the buildings enumerated on the axonometric at the top of this article - see Key.
[edit] • (1) The MallHeight: Accommodation: Located on 7 floors Construction period: 2015-2019 Architect: Kohn Pederson Fox NOTE:. The Mall contains shops and restaurants - see also (2). |
[edit] • (2) The Food |
[edit] • (3) The VesselHeight: 46m Accommodation: 16 stories Construction period: 2016-2019 Architect: Thomas Heatherwick |
[edit] • (4) The ShedHeight: Accommodation: variable Construction period: 2015-2019 Architect: Diller Scofidio + Renfro NOTE: As part of the Hudson Yards rezoning plan, the city preserved a parcel of city-owned land on West 30th Street between 10th and 11th Avenues, adjacent to The High Line, for future cultural use. |
[edit] • (5) The ObservatoryHeight: 340m Accommodation: Located on the 100th and 101st floors Construction period: 2014-2019 Architect: Kohn Pederson Fox NOTE: 30 Hudson Yards features an 1,100-foot-tall (340 m) outdoor observation deck known as "The Edge", located on the 100th and 101st floors - see (7). |
[edit] • (6) 10 Hudson YardsHeight: 268m Accommodation: 52 floors Construction period: 2013-2016 Architect: Kohn Pederson Fox |
[edit] • (7) 30 Hudson YardsHeight: 395m Accommodation: 73 floors Construction period: 2014-2019 Architect: Kohn Pederson Fox |
[edit] • (8) Tapestry Inc. (formerly Coach)Height: Accommodation: variable Construction Architect: NOTE: Headquarters, 10 Hudson Yards - see (6). |
[edit] • (9) 15 Hudson YardsHeight: 280m Accommodation: 88 floors Construction period: 2014-2019 Architect: Kohn Pederson Fox |
[edit] • (10) 35 Hudson YardsHeight: 300m Accommodation: 72 floors Construction period: 2015-2019 Architects: Skidmore, Owings and Merrill and |
[edit] • (11) 55 Hudson YardsHeight: 240m Accommodation: 51 floors Construction period: 2015-2019 Architects: Kohn Pedersen Fox and Roche-Dinkeloo |
[edit] • (12) 50 Hudson YardsHeight: 299m Accommodation: 58 floors Construction period: 2018-2019 Architect: Foster + Partners |
[edit] • (13) The High LineLength: 2.33km Accommodation: variable Construction period: 2009 Architects: James Corner Field Operations, Diller Scofidio + Renfro, and Piet Oudolf. |
[edit] • (14) The West YardsHeight: Accommodation: variable Construction period: c.2012+ Architect: NOTE: The West Side Yard, between Penn Station and the Hudson River, as it appeared before the Hudson Yards real estate development project broke ground in 2012. |
[edit] • (15) The Tunnel BoxHeight: 11m Length: 240m Accommodation: variable Construction period: 2014-2017 Architect: |
[edit] • (16) 441 9th AveHeight: Accommodation: 17-story office building on top of renovated eight-story warehouse Construction period: 2019 Architect: Kohn Pedersen Fox NOTE: (16) is hidden behind (12) on the axonometric |
• Table 3: Images 1 to 15 relate to buildings enumerated on the axonometric at the top of this article - see Key
"New York is a real-estate town - so it's constantly getting territorialised and privatized. My dream is to preserve public space - preserve unprogrammed space for the public. Park space is part of that. If I could have it my way I would take the whole ground floor of Manhattan and make it public so all of these lobbies, the extended streets and everything."
- (Elizabeth Diller, Architect, Partner-in-charge on designing The Shed, quotation from a DLD Conference in 2018) [4]
[edit] Notes
[1] Davidson, J. (2019) 'I Have a Feeling We’re Not in New York Anymore - Hudson Yards is a billionaire’s fantasy city and you never have to leave — provided you can pay for it', Intelligencer.
[2] New York Botanical Garden (2023) 'Mannahatta Map', welikia.org
[3] Zhang, M. (2018) 'The New York City Evolution Animation', YouTube.
[4] DLD Conference (2018) 'Space On Demand: Designing The Shed (Elizabeth Diller & Hans Ulrich Obrist) | DLD New York 18', YouTube.
[edit] Further Reading
Canadian Centre for Architecture (2004) 'A Lung for Midtown Manhattan: Cedric Price's entry to the IFCCA Prize Competition for the Design of Cities, 1999'.
CityRealty Staff (2021) 'Hudson Yards: The ultimate rundown of developments transforming Manhattan's Far West Side', CityRealty.
Muschamp, H. (1999) 'CRITIC'S NOTEBOOK; Design Fantasies for a strip of the West Side', The New York Times. Also on extremelyprovocative.wordpress.com
TED (2021) 'A stealthy reimagining of urban public space | Elizabeth Diller', YouTube.
reSITE (2017) 'James Corner on Why Public Spaces Need Creativity and Design', YouTube.
Sypher, F. J. (2015) 'The Schagen Letter', New Amsterdam History Center.
Unattributed (2023) '1626: Purchase of the Island of Mannahatta', History101.nyc.
Zhang, M. (2021) 'The Privatization of Public Space in Lower Manhattan', myleszhang.org
--Archiblog 08:12, 15 Dec 2023 (BST)
[edit] Related articles on Designing Buildings
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.

















































































