How to financially plan for future construction projects
Contents |
[edit] Introduction
From a few thousand to millions of pounds to construct and finish a project, it is easy to think that you have ample room within the budget. But, increasingly, we hear horror stories of large-scale construction projects going over budget by thousands, sometimes millions of pounds. Is this poor financial planning and management or the result of unrealistic expectations?
There is no doubt that a tight hold on the construction budget is critical but how do clients go about bringing a project in on budget? Here are 5 tips for efficient financial planning.
[edit] Look back
Look at past projects and how they performed in terms of the budget allocated to the build. What were the main financial problems? Was it not keeping an eye on the budget or not enough detail in the planning stage?
Taking time to look at past projects and similar projects undertaken by other companies, you may offer valuable lessons for future projects.
[edit] Detailed budget
The budget figure is not a ‘ball park’ one, it is fixed and firm. Projects are expected to come in on budget or under budget, but not over.
A detailed breakdown of the budget, where it needs to be spent, and how much, is critical to the success of the project.
A small emergency fund (contingency) – usually around 10 to 15% of the overall budget – should be kept back to meet unexpected or unforeseen budgetary issues.
[edit] Cost monitoring tools
Cost monitoring tools are a worthwhile investment. Set the parameters by inputting the detailed budget as the benchmark and input data (invoice amounts, for example) against individual headings, also known as departments.
It is then possible to see where the budget is heading, and to monitor spending in key areas - giving valuable information for future projects too.
[edit] Real time reporting
As well as monitoring expenditure, there will be times when it is necessary to discuss the budget with key members of the build. The more accurate and up to date this financial information, the more useful it will be.
Real time reporting also helps determine where money is being spent, making it possible to monitor the value of expenditure. It also highlights where unforeseen expense happened and helps, not only determine why but cheaper, more cost-effective ways of doing things without compromising on quality or build time.
[edit] Don’t be frightened of new build technology
Building with bricks, mortar, concrete and breeze block may, to some people, be the accepted norm, the only way of doing things. Just because someone is more comfortable and familiar with a build technology doesn’t mean it is the only way of doing things.
Some of these accepted and traditional build methods are expensive today. When the budget is buckling under the weight of the project, it may be appropriate to try new build technologies that shave pounds and pence from costs.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Classroom electrician courses a 'waste of money'
Say experts from the Electrical Contractors’ Association.
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.