Handover and close out
NB The 2020 edition of the RIBA Plan of Work has renamed this stage 'Handover'.
The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages). As a result, it is important that appointment documents make it clear explicitly what activities fall within which stage, and what level of detail is required, rather than relying on rather vague stage names.
‘Handover and Close Out’ was a new phrase coined by the Royal Institute of British Architects (RIBA) for the 2013 Plan of Work. This plan comprised eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.
- 0 - Strategic definition.
- 1 - Preparation and brief.
- 2 - Concept design.
- 3 - Developed design.
- 4 - Technical design.
- 5 - Construction.
- 6 - Handover and close out.
- 7 - In use.
The RIBA states that Stage 6, Handover and Close Out maps broadly to the former Stage L: Post Practical Completion.
They describe the activities carried out during the stage as, ‘handover of building and conclusion of building contract’ including updating ‘as constructed’ information, commissioning, training and perhaps post-occupancy evaluation following the ‘soft landings’ process. Presumably the stage also includes tasks associated with the defects liability period and issuing the final certificate, although these are not described.
Previously, this stage might have been described as the ‘defects liability period’, the period which begins on certification of practical completion at the end of the construction stage and typically lasts six to twelve months, during which the client takes possession of the site, defects are rectified and then the final certificate issued. This is perhaps a better description of the stage and in the Designing Buildings Wiki project plans, we describe this stage as the ‘occupation and defects liability period’
The 2020 edition of the RIBA Plan of Work has renamed this stage 'Handover'.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- BREEAM Handover.
- Comparison of work stages.
- Creating an asset register for construction projects.
- Defects liability period.
- Designing Buildings Wiki Project plans.
- Developed design.
- Handover to client.
- Migration strategy.
- RIBA Plan of Work.
- Soft landings.
- Traditional contract: occupation and defects liability period.
[edit] External references
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.