Firefighting lift
Buildings other than low-rise buildings without a deep basement, require additional facilities to enable the fire and rescue service to avoid delay, reach fires, work near fires, and to provide a secure operating base. This includes the provision of; firefighting lifts, firefighting stairs and firefighting lobbies, combined in a protected shaft described as a ‘firefighting shaft’ (although not all firefighting shafts need to include firefighting lifts).
The very basic requirements for firefighting shafts are illustrated below. Blocks of flats are treated differently from other buildings because of their high degree of compartmentation.
Approved Document B - Fire Safety: Volume 2 - Buildings other than dwellinghouses, defines a firefighting lift as, ‘A lift with additional protection and with controls that enable it to be used by the fire and rescue service when fighting a fire.'
A firefighting lift includes; the lift car, the lift well, the lift machinery space, the lift control system and the lift communications system. Firefighting lifts have very specific safety requirements and the presence of firefighting controls within a lift does not necessarily mean that it is a firefighting lift. Firefighting lifts should comply with the requirements of BS EN 81-72:2015 and BS EN 81-1:1998 or BS EN 81-2:1998.
Replacing EN 81-1 and 81-2, EN 81-50 provides the framework for design and testing of elevator components. The standard is binding as of 1 September 2017 for all new elevators.
NB an evacuation lift is a lift that may be used for the evacuation of people in a fire. It is generally not appropriate to use lifts if there is a fire because of the danger that they will become immobilised. However, in some circumstances lifts may be provided as part of a management plan for evacuation, although they will then need to be appropriately sited and protected and may need to contain a number of additional safety features. Where a firefighting lift provides access and facilities for the fire service, this can be used as part of a management plan for evacuating disabled people. However, any such plan should include contingency provisions for when the fire and rescue service arrive.
[edit] Related articles on Designing Buildings Wiki
- Approved documents.
- Escalator.
- Fire and rescue service.
- Fire compartmentation.
- Fire resistance.
- Firefighting lobby.
- Firefighting route.
- Firefighting shaft.
- Lifting platform.
- Lifts.
- Lifts and Escalators: A Quality Perspective.
- Lifts and Their Special Operating Modes.
- Means of escape.
- The importance of service lifts.
Featured articles and news
Fire doors and the Fire Door Inspection Scheme.
Three-quarters of fire doors fail inspections
UN International Day for Biological Diversity, May 22.
The role of geoparks, biospheres and world heritage sites.
BSRIA conference 2022, June 23.
Just one month to go ! Find out more here.
Restoring Broadbent’s Bath House
A new gallery for the University of Huddersfield.
Corruption in the construction industry.
What will it take to stop it ?
To celebrate world bee day 2022 !
Just one month until the changes to part L come into effect.
Not forgetting part F and the new part overheating part O.
Heat Pump demand rises by one quarter.
As energy prices jump up in cost.
With people in the UK from Ukraine.
Industry leader Steve Murray takes on role.
An abundant and versatile building material.
How overheating complicates ending gas in the UK.
600,000 heat pump installations targeted per year by 2028.
Cost planning, control and related articles on DB.
Helping prevent those unwanted outcomes.
ICE debate Public transport - post pandemic.
How has transport changed due to Covid-19 ?
Cross-ventilation in buildings. Do you have it ?
Will you need it ? after June 15 and the new Part O ?
Share your knowledge with the industry.
Create an account and write the first of many articles.
The green jobs delivery group.
CIAT commentary after the first meeting.
Liverpool's world heritage site status
Who is to blame?
Research recommends focussing on portfolio success rather than project success.
ICE and BSI launch revised PAS 128 standard.
The revised standard for mapping underground utilities.