Fabricated drainage stacks
With more pressure being placed on them, M&E consultants and contracts have to ensure that the systems they specify and install are able to stand up to the long-term tests they’re faced with. With this in mind, many consultants and contractors are turning to accredited systems to ensure both their longevity and sustainability.
Some manufacturers, such as Polypipe Terrain, offer fabricated drainage stacks boasting BES6001 accreditation. This means that the products are not only traceable through the entire supply chain, but they also encourage contractors to think responsibly too. By using systems manufactured off-site which are delivered ready to install, waste and carbon emissions can be kept to a minimum.
Aside from being more sustainable, fabricated drainage stacks are manufactured in a controlled factory setting, reducing the health and safety risks associated with drainage systems which are jointed on-site. Additionally, every drainage stack is air tested as standard, instilling confidence in the entire supply chain that the systems will stand the test of time.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.