Engineering procurement and construction contract
Engineering, procurement, and construction (EPC) contracts, sometimes called turnkey contracts are similar to design and build contracts, in that there is a single contract for the design and construction of the project, but generally with an EPC contract, the client has less say over the design of the project and the contractor takes more risk.
On a design and build project, the client may produce an outline design upon which tenders are sought. On an EPC project, the client may seek tenders based on a performance specification and then have no input into the design, other than if variations are instructed.
Payment can be on a lump sum, cost reimbursable basis, or some other basis, but generally the client would be likely to seek a fixed price, lump sum agreement where the responsibility for cost control is taken by the contractor. This gives the client a relatively risk-free arrangement, with one point of responsibility and cost certainty. They can therefore operate the contract with the minimum resource.
The clients main risk lies in the definition of the specification upon which the contract is based. If the specification is not well developed and concise otherwise the quality and performance of the completed development may be compromised (see performance specification and output-based specification for more information)
Generally, EPC contracts are used on engineering and infrastructure projects, or industrial projects, where the aesthetics of design might be considered less important to the client than performance and cost certainty.
The FIDIC Conditions of Contract for EPC Turnkey Projects (The Silver Book) is an example of an engineering procurement and construction contract.
[edit] Related articles on Designing Buildings
- Construction contract.
- Contract conditions.
- EPCM contract.
- FIDIC.
- Output-based specification.
- Performance specification.
- Procurement route.
- Procurement team.
- Reliance data in EPC contracts.
- What is an EPC contract?
[edit] External references
- Skills Funding Agency: Procurement routes.
- CABE: Procurement routes.
- PACE Guidance on the Appointment of Contractors and Consultants for a detailed analysis of the pros and cons of various procurement routes.
- nbs: National Construction Contracts and Law Survey 2012.
Featured articles and news
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.