Detention pond definition
Approved Document H - Drainage and Waste Disposal, gives the following definition:
'Detention ponds are used to attenuate the flow from a drainage system, to limit the peak rate of flow into a sewer system or watercourse. Further information on design may be found in the references given in paragraph 3.36 and in Sustainable Urban Drainage Systems – A Design Manual for England and Wales published by CIRIA.' (This has been superseded by The SUDS manual (2011 reprint with errata), 2007).
Paragraph 3.36 suggests that the requirement can be met by following the relevant recommendations of:
- BS EN 752-4 Drain and sewer systems outside buildings; Part 4 Hydraulic design and environmental considerations, clauses 3 to 12 and National Annexes NA, NB and ND to NI. (Withdrawn and replaced by BS EN 752 below).
- BS EN 752 Drain and sewer systems outside buildings.
- BS EN 1295-1:1997 Structural design of buried pipelines under various conditions of loading. General requirements.
- BS EN 1610:1998 Construction and testing of drains and sewers. (Withdrawn and replaced by BS EN 1610:2015 Construction and testing of drains and sewers).
See also: Balancing pond.
[edit] Related articles on Designing Buildings
- Aquatic bench.
- Are sustainable urban drainage systems the response to our changing climate?
- Balancing pond.
- Barking Riverside development landscape.
- Basin.
- Bund.
- Catchment flood management plans.
- Culvert.
- Flood and Water Management Act.
- Lagoon.
- Rainwater harvesting.
- River engineering.
- Soakaway.
- SuDS infographic.
- Sustainable urban drainage systems SUDS.
- Swales definition.
- Water Act 2014.
- Water engineering.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.