Design studies
The RIBA Plan of Work published by the RIBA in 2020 defines design studies as: ‘Detailed studies that develop aspects of the building further during Stage 3 (spatial coordination). For example, looking at the façade of the building in greater detail or developing the detail of a core space, such as the entrance lobby. Design Studies consider how the engineering aspects (for example, lighting and structural options for the entrance lobby) can be successfully coordinated into the design.’
It proposes that design studies do not change the concept, but focus on developing greater detail to inform the cost plan and facilitate more comprehensive coordination exercises.
It suggests that on larger projects, design studies might be undertaken by multidisciplinary teams who will analyse all aspects of a specific topic, such as; fire engineering, structural solutions, acoustics, heat gain, glare, access and maintenance, and so on, testing the assumptions made in the concept.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.

















