The term ‘construction team’ can have numerous interpretations in the industry. If it involves those roles that are needed to physically construct the project, it will be different than if it involves those who are responsible for the conception, planning and design of the project, such as the architect and structural engineer.
Very broadly, the construction team will include those project team members who are tasked with physically constructing what the design team has stipulated in its documentation and specifications. During the course of the project, the construction team may be subject to periodic checks and inspections by design team members to ensure the construction is on track to meet the specification and client requirements.
Typically, the construction team will comprise the following roles that will be mostly site based:
- Project Manager (responsible for delivering the project)
- Main contractor
- Site manager (clerk of works)
- Site engineer
- Sub-contractors
However, today’s construction projects tend to be complex undertakings and on large projects can involve thousands of people. This may mean that the construction team includes a wide range of specialists and teams responsible for specific aspects of the works and other project stakeholders, such as expert suppliers whose knowledge the project relies upon.
On design and build projects, where the contractor is responsible for both designing and constructing the project (and possibly for the maintenance of the completed building), one or more architects and engineers are likely be working for the contractor and therefore may be considered part of the construction team.
Engagement Overlay to the RIBA Plan of Work, published by the RIBA in January 2024, states: ‘The construction team is responsible for manufacturing, assembling, or constructing a building, including the logistics and contractual relationships connected with this. The level of design input will be driven by the contractual obligations.’
[edit] Project team
The construction team will normally form part of a larger project team which may include a project board, client representatives, design team and other stakeholders such as the building’s users.
For more information see: Project team.
[edit] Design team
The design team involves the professionals that are required to design the works and perhaps to ensure the completed works satisfy the project brief.
For more information see: Design team.
NB The Inclusive Design Overlay to the RIBA Plan of Work published by the RIBA in 2023, states: ‘The contractor is the organisation traditionally responsible for the construction of the development. However, in many construction contracts the contractor will also have substantial design responsibilities and will often employ designers to fulfil this role. Co-ordination and continuity between the employers and the contractor’s designers is therefore essential to maintain the inclusion standards. The Construction Team is responsible for manufacturing, assembling, or constructing a building, including the logistics and contractual relationships connected with this. The level of design input will be driven by the contractual obligations.’
[edit] Relate articles on Designing Buildings
- Appointing consultants.
- Collaborative practices.
- Commercial manager.
- Construction project.
- Consultant team.
- Design team.
- Discipline.
- Egan report.
- Integrated project team.
- Integrated supply team.
- Latham report.
- Lead consultant.
- Lead designer.
- Leadership styles.
- Multi-disciplinary.
- Project manager.
- Project team for building design and construction.
- Project teams for the future built environment.
- Stakeholders.
- Succession planning.
- Team management.
Featured articles and news
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.