Construction contract particulars
The contract particulars in a construction contract (or appointment agreement) set out the aspects of the contract that are particular to the project to which the contract relates. They are commonly found in standard forms of contract and are used to set out details that are at the discretion of the contracting parties, or identify the options that will be used from within the contract conditions, but without altering the overall intention of the contract clauses. Amending the conditions themselves might have unintended consequences.
These project-specific details are sometimes found in appendices to contracts, but are now commonly entered in a ‘contract particulars’ section at the beginning.
It is very important that the details in the contract particulars are filled in carefully, and the implications properly understood.
The nature and extent of the contract particulars will depend on the type and complexity of the agreement being entered into, however, they might include:
- The contract sum.
- The retention percentage.
- The interim payment period.
- Requirement for collaborative working.
- Requirement for early warning notification.
- Addresses for servicing notices.
- Nominees for negotiations.
- The details of the adjudicator / arbitrator or appointing body.
- Third party rights and collateral warranties.
- The contract base date.
- The completion date (or sectional completion dates).
- Details of key personnel.
- The date for possession.
- The maximum permitted period for the deferment of possession.
- Notice to proceed provisions (management contract)
- The amount of liquidated damages.
- The length of the defects liability period (or rectification period).
- The duration of the CDM planning period.
- Insurance requirements.
- Requirement to comply with the joint fire code.
- Net contribution clauses for sub-contractors.
- Permitted period for suspension of the works before the contract can be terminated.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Causes of construction disputes.
- Construction contract.
- Contract claims.
- Contract conditions.
- Housing Grants Construction and Regeneration Act.
- JCT.
- Modifying clauses in standard forms of construction contract.
- Procurement route.
- Scheme for Construction Contracts.
- Sub-contract.
Featured articles and news
CIOB report; a blueprint for SDGs and the built environment
Pairing the Sustainable Development Goals with projects.
Latest Build UK Building Safety Regime explainer published
Key elements in one short, now updated document.
UKGBC launch the UK Climate Resilience Roadmap
First guidance of its kind on direct climate impacts for the built environment and how it can adapt.
CLC Health, Safety and Wellbeing Strategy 2025
Launched by the Minister for Industry to look at fatalities on site, improving mental health and other issues.
One of the most impressive Victorian architects. Book review.
Common Assessment Standard now with building safety
New CAS update now includes mandatory building safety questions.
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.