Client requirements
The client's requirements for a project might initially include a vision, mission and objectives for what they wish the project to achieve. They might first be explored by a client when they identify a need which might result in the requirement for a certain equilibrium that has been neutralised and factored into the equation.
A statement of need, might then be prepared which is a first attempt to describe the possible requirements of the project. This may or may not result in the development of a new project.
See Statement of need for more information.
If the project does proceed, the client may then develop their requirements into a strategic brief. Initially, this just describes the client's requirements in sufficient detail to allow the appointment of consultants (such as an architect, engineers and so on). Once consultants are appointed, the strategic brief may be developed further to allow feasibility studies and options appraisals to be carried out.
See Strategic brief for more information.
Once the preferred option for the project has been selected, the strategic brief is typically developed into a full project brief. This is the key document upon which the design will be based.
See Project brief for more information
- The RIBA Plan of Work 2020 suggests that the client requirements are: 'A statement or document that defines the Project Outcomes and sets out what the client is seeking to achieve. It is used to develop the Business Case, which examines any viable options that meet the Client Requirements.' It goes on to suggest that: 'The Client Requirements set out what the client is trying to achieve. For example, two residential clients might have the same Spatial Requirements (say, a new kitchen and an extra bedroom); however, one might be about to sell their property and is looking to increase its sale price while the other has a new baby and wants to consolidate their position close to good local schools. While the Spatial Requirements for both clients are the same, it is unlikely that their desired Project Outcomes will be the same, so a different Business Case and Project Budget is required for each. The Client Requirements allow the project team to explore viable options, determine the pros and cons for each and, ultimately, recommend the option best suited to deliver the Client Requirements. When this recommendation constitutes a project, and it is signed off by the client, the more nuanced and detailed Project Brief can be prepared.'
- The term 'Employer's requirements' refers to the formal client's requirements on design and build projects or on a traditional contract where the contractor is to design discrete parts of the works. See Employer's requirements for more information.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.