CDM 2007 Construction phase plan
The CDM regulations were revised in 2015 and this article is no longer current. It is provided here for historical reference only.
For information about the CDM 2015 construction phase plan, see Construction phase plan.
The Construction (Design and Management) Regulations 2007 (CDM regulations), required that on all notifiable projects, a principal contractor is appointed, and that they develop a construction phase plan setting out how health and safety will be managed during the construction of the project.
Notifiable projects are those which last more that 30 days or involve more than 500 person-days of construction work.
The client must not allow work on site to proceed unless a construction phase plan (CPP) has been prepared, at least for the early stages of the works, and arrangements for the development of the rest of the plan (including the incorporation of information from sub-contractors) has been established.
The construction phase plan should be specific to the project (rather than generic), concise and easy to understand (perhaps with explanatory photographs or drawings).
It might include:
- A description of the works.
- Contact details for those involved in the project.
- Roles and responsibilities.
- A description of existing information and where it can be found.
- The health and safety standards to which the works will be carried out.
- Communication, training and monitoring arrangements.
- Pre-construction issues.
- Arrangements for managing the works, such as security, traffic management, site rules and welfare arrangements.
- Assessment of risks.
- Arrangements for managing significant risks.
- Emergency procedures.
- Information about restrictions which may affect the work (such as restrictions imposed by the client).
- Arrangements for creating the health and safety file.
- Circumstances under which risk assessments or method statements should be prepared.
- Sources of other information.
A detailed list of the possible contents of the construction phase plan was published in appendix 3 of Managing Health and Safety in Construction Construction (Design and Management) Regulations 2007 Approved Code of Practice.
The construction phase plan is different from the health and safety file which is prepared by the CDM co-ordinator and provides information allowing future work to the building to be carried out safely.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.























Comments