BREEAM Drying space
Contents |
[edit] Aim and benefits
The aim of this credit is to allow residents a space to dry clothes which is not energy intensive (tumble drying), and does not cause damp in the home.
This issue offers the following potential benefits to end users and clients:
- Reduced energy consumption / energy bills;
- In multi-residential accomodation, allows for space saving / lifestyle options in dwellings through centralised facilities.
[edit] When to consider
During RIBA Stage 2, establish whether drying space in individual residences is more appropriate, or a communal drying area.
If a communal drying area is suggested, allow sufficient space in the concept design.
Drying spaces in residences can be considered relatively late on in the process, around RIBA Stage 3 to 4, as there are very space efficient methods of achieving the credit, so premium space is not necessarily required.
[edit] Step by step guidance
Awaiting content
[edit] Questions to ask while seeking compliance
Awaiting content
[edit] Tools and resources
Ideas for alternative styles of drying rack to typical solution:
[edit] Tips and best practice
Often clients do not particularly want to include drying space. This is because the standard solution (a pull out rack over a bath) isn't the most attractive of options. It may be that you need to remind the client of what the purpose of this credit is, and perhaps suggest alternative drying rack options which still meet the aims of the credit but meet the aesthetic of the property better.
[edit] Typical evidence
[edit] Design Stage
[edit] Individual drying space:
- Architectural drawing(s) showing location of drying space
- Architectural specification detailing manufacturer of drying rack
- Manufacturer's data stating length of drying line
- [If internal] M&E specification stating required heating and ventilation for room with drying rack in
- [If external] details of posts/footings/fixings
[edit] Communal drying space:
- Architectural drawing(s) showing location of drying space
- Architectural specification detailing manufacturer of drying rack
- Manufacturer's data stating length of drying line
- [If internal] Architectural (or M&E) specification detailing access controls
- [If internal] M&E specification stating required heating and ventilation for room with drying rack in
- [If external] Details of how external space is accessible only to residents (marked up drawing, access statement)
- [If external] details of posts/footings/fixings
[edit] Post Construction Stage
- As per design stage, plus
- Site Inspection Report with photographs confirming
- Location of drying space
- Sufficient length
- Access controls
- Permanent fixing
- Heating and ventilation provision
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- Written to cover UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Tom Blois-Brooke 16:45, 01 Jul 2019 (BST)
--Multiple Author Article 21:59, 21 Apr 2018 (BST)
Featured articles and news
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.