Approved Document M
Contents |
[edit] Introduction
The Building Regulations establish standards that must be achieved in the construction of buildings.
A series of Approved Documents set out what typically would be acceptable for compliance with the relevant requirements of Building Regulations. There is no legal obligation to follow the guidance in the Approved Documents.
The Approved Document M – Access to and Use of Buildings provides guidance document relating the requirements of the Building Regulations for access to and the use of buildings. The latest version was published in March 2015 and took effect on 1st October 2015. The previous, 2004 amended edition remained applicable to all building work started before that date. The main change introduced by the 2015 first edition of the Approved Document was that it is was provided in two volumes.
In March 2016 Approved Document M Volume 1 2015 edition was published with 2016 amendments.
In July 2020 Approved Document M Volume 2 access to and use of buildings, amended, buildings other than dwellings
In June 2021 Approved Document M Volume 2 incorporated the 2020 amendments.
[edit] Volume 1 - Access to and use of dwellings
The 2015 edition of Volume 1 introduces three different types of dwellings:
- Category 1 – Visitable dwellings.
- Category 2 – Accessible and adaptable dwellings.
- Category 3 – Wheelchair user dwellings.
The guidance provided in Volume 1 is only applicable to new dwellings and dwellings undergoing material alterations. Extensions to dwellings are not covered. It provides guidance for compliance with the requirements of M4(1), M4(2) and M4(3) of Schedule 1 of the Building Regulations.
The requirements set out in M4(2) Accessible and adaptable dwellings and M4(3) Wheelchair user dwellings, are optional requirements that only apply if imposed on new development as part of the process of granting planning permission. Otherwise, only the requirements of M4(1) Visitable dwellings apply.
[edit] Requirement M4(1): Category 1 – Visitable dwellings
Compliance with this requirement is achieved when a new dwelling makes reasonable provision for most people, which includes wheelchair users to access and enter the dwelling, and access habitable rooms and sanitary facilities on the entrance level.
[edit] Requirement M4(2): Category 2 – Accessible and adaptable dwellings
This requirement is met when a new dwelling provides reasonable provision for most people to access the dwelling and includes features that make it suitable for a range of potential occupants, including older people, individuals with reduced mobility and some wheelchair users.
[edit] Requirement M4(3): Category 3 – Wheelchair user dwellings
This requirement is achieved when a new dwelling provides reasonable provisions for a wheelchair user to live in the dwelling and have the ability to use any outdoor space, parking and communal facilities.
[edit] Volume 2 - Access to and use of buildings other than dwellings
Approved Document M Volume 2 provides guidance for compliance with the requirements of M1, M2, M3 of Schedule 1 to the Building Regulations.
It is applicable to:
- A newly constructed non-domestic building.
- The extension or material alteration of an existing non-domestic building.
- The change of use of an existing building or part of an existing building to a hotel or boarding house, institution, public building or shop.
The requirements of M1 – M3 will be achieved when reasonable provision is made to ensure that buildings are accessible and usable and that individuals, regardless of their age, gender or disability are able to, ‘...gain access to buildings and to gain access within buildings and use their facilities, both as visitors and as people who live and work in them.’
[edit] Related articles on Designing Buildings
- Accessibility in the built environment.
- Access and inclusion in the built environment: policy and guidance.
- Access consultant.
- Accessible London.
- Approved documents.
- Braille signage and accessibility.
- Building regulations.
- Changing lifestyles.
- Equality Act.
- Inclusive design.
- Lifetime homes.
- Lifetime Homes Design Guide (EP 100).
- Lifetime neighbourhoods.
- Lifts.
- Older people.
- People with disabilities.
- Ramps.
- Shower.
- Stairs.
- Wheelchair user.
[edit] External references
Featured articles and news
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation which closes 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Comments