User contributions
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
- 07:10, 6 February 2025 (diff | hist) N Dynamic stiffness (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines dynamic stiffness as: ‘A parameter used to des...") (top)
- 07:09, 6 February 2025 (diff | hist) N D nT,w + C tr (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines D_nT,w + C_tr as: ‘A single-number quantity wh...") (top)
- 07:07, 6 February 2025 (diff | hist) D nT,w (top)
- 07:06, 6 February 2025 (diff | hist) N D nT,w (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines D_nT,w as: ‘A single-number quantity which cha...")
- 07:05, 6 February 2025 (diff | hist) N D nT (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines D_nT as: The difference in sound level between a...") (top)
- 07:03, 6 February 2025 (diff | hist) N Direct transmission (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines direct transmission as: ‘The process in which ...") (top)
- 07:02, 6 February 2025 (diff | hist) N C tr (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines C_tr as: ‘The correction to a sound insulation...") (top)
- 06:56, 6 February 2025 (diff | hist) N Cavity stop (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines a cavity stop as: ‘A proprietary product or ma...") (top)
- 06:55, 6 February 2025 (diff | hist) Caulking (Redirected page to Caulk) (top)
- 06:54, 6 February 2025 (diff | hist) N Air path (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines an air path as: ‘A direct or indirect air pass...") (top)
- 06:52, 6 February 2025 (diff | hist) N Airborne sound insulation (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines airborne sound as: ‘Sound propagating through ...") (top)
- 06:51, 6 February 2025 (diff | hist) N Absorptive material (Created page with "Approved document E: Resistance to the passage of sound, 2003 edition incorporating 2004, 2010, 2013 and 2015 amendments, defines an absorptive material as a: ‘Material that ab...") (top)
- 06:50, 6 February 2025 (diff | hist) N Absorption coefficient (Redirected page to Sound absorption coefficient) (top)
- 06:49, 6 February 2025 (diff | hist) Absorption (top)
- 07:14, 5 February 2025 (diff | hist) Vapour barrier (top)
- 07:13, 5 February 2025 (diff | hist) N Surface condensation (Created page with "Approved document C: Site preparation and resistance to contaminants and moisture, 2004 edition incorporating 2010 and 2013 amendments defines surface condensation as: ‘Deposit...") (top)
- 07:11, 5 February 2025 (diff | hist) Types of roof (top)
- 07:10, 5 February 2025 (diff | hist) Precipitation (top)
- 07:09, 5 February 2025 (diff | hist) Interstitial condensation (top)
- 07:07, 5 February 2025 (diff | hist) Groundwater (top)
- 07:05, 5 February 2025 (diff | hist) N Contaminant (Created page with "Approved document C: Site preparation and resistance to contaminants and moisture, 2004 edition incorporating 2010 and 2013 amendments defines contaminant as: ‘Any substance wh...")
- 07:04, 5 February 2025 (diff | hist) N Building and land associated with the building (Created page with "Approved document C: Site preparation and resistance to contaminants and moisture, 2004 edition incorporating 2010 and 2013 amendments defines building and land associated with t...") (top)
- 07:01, 5 February 2025 (diff | hist) N Spray (Created page with "In general terms, the word 'spray' refers to any liquid that is blown or driven through the air in the form of small droplets. Approved document C: Site preparation and resistan...") (top)
- 06:51, 5 February 2025 (diff | hist) N Solar shading device (Created page with "Approved document B: Fire Safety, Volume 2: Buildings other than dwellings, 2019 edition incorporating 2020 and 2022 amendments, defines a solar shading device as: ‘A device at...") (top)
- 06:45, 5 February 2025 (diff | hist) Supported wall (top)
- 06:44, 5 February 2025 (diff | hist) Span (top)
- 08:32, 4 February 2025 (diff | hist) Construction tolerances (top)
- 08:32, 4 February 2025 (diff | hist) Spacing (top)
- 08:31, 4 February 2025 (diff | hist) N Spacing (Created page with "In the UK construction industry, the term "spacing" has several meanings depending on the context in which it is used. It generally refers to the measured distance betw...")
- 08:28, 4 February 2025 (diff | hist) Separating wall
- 08:26, 4 February 2025 (diff | hist) N Cavity width (Created page with "Approved document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments, defines cavity width as: ‘The horizontal distance between the two leaves of a cavity ...") (top)
- 08:25, 4 February 2025 (diff | hist) N Approved document A: Structure (Redirected page to Approved Document A) (top)
- 08:24, 4 February 2025 (diff | hist) Wall types
- 08:23, 4 February 2025 (diff | hist) N Buttressing wall (Created page with "Approved document A: Structure, 2004 edition incorporating 2004, 2010 and 2013 amendments, defines a buttressing wall as: ‘A wall designed and constructed to afford lateral sup...") (top)
- 08:19, 4 February 2025 (diff | hist) N NANDO (Redirected page to New Approach Notified and Designated Organisations) (top)
- 08:17, 4 February 2025 (diff | hist) Mixed use development (top)
- 08:15, 4 February 2025 (diff | hist) N Mixed-use building (Redirected page to Mixed-use development)
- 08:14, 4 February 2025 (diff | hist) In-building physical infrastructure (top)
- 08:11, 4 February 2025 (diff | hist) N Public electronic communications network (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a public elec...") (top)
- 08:09, 4 February 2025 (diff | hist) N USO-standard public electronic communications network (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a public elec...") (top)
- 08:07, 4 February 2025 (diff | hist) Network termination point (top)
- 08:06, 4 February 2025 (diff | hist) N Network operator (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a network ope...") (top)
- 07:06, 4 February 2025 (diff | hist) Newsletter archive
- 07:05, 4 February 2025 (diff | hist) N File:Designing Buildings Newsletter 4 2 2025.pdf (Designing Buildings Newsletter 4 2 2025) (top)
- 06:54, 4 February 2025 (diff | hist) CIOB Northern Ireland inspires next generation of construction talent (top)
- 08:51, 3 February 2025 (diff | hist) Building Safety Wiki quick links (top)
- 08:49, 3 February 2025 (diff | hist) Building Safety regulations index
- 07:48, 3 February 2025 (diff | hist) High-speed electronic communications network (top)
- 07:47, 3 February 2025 (diff | hist) N Gigabit-ready physical infrastructure (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines gigabit-ready...") (top)
- 07:45, 3 February 2025 (diff | hist) N Gigabit-capable public electronic communications network (Created page with "Approved Document R: Infrastructure for electronic communications, Volume 1: Physical infrastructure and network connection for new dwellings, 2022 edition, defines a gigabit-cap...") (top)
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.

















