Lands Chamber
Contents |
[edit] Introduction
The Lands Chamber is one of four chambers within the Upper Tribunal, part of the UK’s administrative justice system. It was formerly the Lands Tribunal, created by the Lands Tribunal Act 1949, but its functions were transferred to the Upper Tribunal in 2009.
The Upper Tribunal was set up to provide a common means for handling appeals against the decisions of lower tribunals. As such it has equivalent status to the High Court, allowing it to set precedents and enforce decisions. It is the only tribunal to have the power of judicial review.
The Lands Chamber is independent and decides on land disputes, as well as appeals from:
- Valuation tribunals.
- Leasehold valuation tribunals.
- Residential property tribunals.
[edit] Applying
It is possible to apply to the tribunal if the case is about:
- Compensation for the compulsory purchase of land.
- Discharge or modification of land affected by a restrictive covenant.
- Compensation for land affected by public works.
- A tree preservation order.
- Compensation for damage to land caused by subsidence from mining.
- Valuation of land or buildings for capital gains tax or inheritance tax purposes.
- Rights to light disputes.
- Compensation for property blight.
However, opting for a mediation service could be quicker and cheaper than applying for the tribunal.
[edit] Appealing
It is possible to appeal to the Lands Chamber if it is believed there was a legal problem with the decision of the tribunals or the First-tier Tribunal (Property Chamber). However, permission must be given by the original tribunal before an appeal is possible (unless the case is about a rates decision made by the valuation tribunal in England or Wales).
The instructions for appealing are contained in the decision letter. A request for permission must be received by the original tribunal within 28 days of the decision letter.
An appeal should include:
- A copy of the decision being appealed.
- A brief summary of what the case is about.
- Whether the party appealing wishes to attend the appeal hearing.
- Whether any expert witnesses are to be called.
- ‘Statement of case’, i.e. why the decision is being appealed.
- Any other documents required.
The Chamber than decides whether to consider the case, and usually will ask the applicant to attend a hearing. Hearings are generally held in public and, depending on the size of the claim, can cost between £275 and £16,500. If the case is won, the chamber may order the other party to pay the hearing costs.
A decision is issued in writing, usually within 3 months of the hearing.
If it is believed there was a legal problem with the decision at the Lands Chamber, it may be possible to appeal to a higher court. If the Chamber judge refuses permission, the applicant can take their appeal request to the Court of Appeal in England and Wales.
[edit] Decisions database
There is a decisions database available to search and find out the reasons why previous decisions have been made by the Chamber.
[edit] Related articles on Designing Buildings Wiki
- Civil procedure rules.
- Court settlement process.
- Disputes.
- European Court of Human Rights.
- Litigation.
- Mediation.
- Planning permission.
- Property blight.
- Property Chamber First tier Tribunal FTT.
- Restrictive covenant.
- Rights to light.
- Technology and Construction Court.
[edit] External resources
- Gov.uk - Upper Tribunal lands
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.