Primary containment
Containment systems for the prevention of pollution, Secondary, tertiary and other measures for industrial and commercial premises (CIRIA C736), published by CIRIA in 2014, defines primary containment as: ‘The most important means of preventing major incidents involving loss of inventory. It is achieved by the equipment that has direct contact with the inventory stored or transferred such as storage tanks, IBCs (intermediate bulk containers), drums, pipework, valves, pumps and associated management and control systems. It also includes equipment that prevents the loss of primary containment under abnormal conditions, such as high-level alarms linked to shut down systems.'
It suggests that secondary containment: ‘Minimises the consequences of a failure of the primary storage by preventing the uncontrolled spread of the inventory. Secondary containment is achieved by equipment that is external to and structurally independent of the primary storage, for example concrete or earth bunds around storage tanks, or the walls of a warehouse storing drums. Secondary containment may also provide storage capacity for firefighting and cooling water.’
And that tertiary containment: ‘Minimises the consequences of a failure in the primary and secondary containment systems. This is done by providing an additional level of protection preventing the uncontrolled spread of the inventory such as site drainage and sumps, diversion tanks and lagoons, containment kerbing to roadways and parking areas and impervious liners and/or flexible booms. Tertiary containment will be used when there is an event that causes the escape of liquids from the secondary containment through failure or overflow (eg bund joint failure, or firewater overflowing from a bund or escaping from building/warehouse during a prolonged fire).’
[edit] Related articles on Designing Buildings Wiki.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.