Price certainty in the construction industry
Price is the amount paid for acquiring a product or a service. It is not the same as cost, which is the amount incurred in making something or providing a service. Price is therefore understood from the buyer’s perspective while cost is understood from the producer/supplier's perspective.
Price certainty can describe a state of affairs whereby before a project or part of a project starts, a contractor is be able to buy materials and components at a fixed, pre-agreed price which is both competitive (possibly below the market average) and advantageous. Certainty is provided by the supplier that the goods will be supplied at the agreed price and at the right time, possibly over a regular period. The basis of price certainty is forward planning and pre-agreement.
For example, a contractor or subcontractor may be able to order a pre-agreed volume of fuel every month at a fixed price for a specified future period. This provides a greater assurance of supply and helps budgeting as it removes the uncertainty of fluctuating fuel costs.
On the supply side, price certainty may contribute to cost certainty in that as a result of the pre-agreement, the supplier receives a fair price for the product or service which covers their production and/or supply costs and leaves them with a profit.
In the absence of agreement, their may be uncertainty about price.
[edit] Related articles on Designing Buildings Wiki
- Budget.
- Capital costs.
- Construction costs.
- Construction price and cost indices.
- Cost control.
- Cost information.
- Cost of building.
- Cost overruns.
- Cost plans.
- Cost vs price.
- Front-loaded costs.
- Estimate.
- Hard costs v soft costs.
- Irrelevant cost.
- Operational costs.
- Other development/project costs.
- Relevant cost.
- Whole life cost.
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.