Since the Grenfell Tower tragedy in 2017, numerous changes have been made to Building Regulations and the wider legislative framework for fire safety in buildings.
Part B of the Building Regulations contains various legal requirements relating to fire safety in buildings. In England, it is supported by guidance in Approved Document B, which is published in two volumes: Volume 1 for dwellings and Volume 2 for non-dwellings.
On 29th March 2024, changes were announced to both volumes of Approved Document B. They were announced in the form of an amendment note, because it will be quite some time before they actually take effect.
The major change is to Volume 1, with new guidance stating that blocks of flats more than 18 m high should have two escape stairs, whereas currently one escape stair is acceptable. This is different from the requirement which came into effect in Greater London in 2023, that planning applications for all buildings (not just residential buildings) over 30 m high include two escape stairs.
Whenever changes are made to Building Regulations or supporting guidance, transitional arrangements are announced. What is unusual this time round is the length of the transition. Basically, the old guidance can be followed as long as a Building Regulations application is made before 30th September 2026, and work starts before 30th March 2028. This is to take into account the extensive design and planning process needed for major projects, and the fundamental rethink that will be needed on new high-rise residential schemes. But it does mean that someone moving into a brand-new tenth-storey flat in 2030 might be in moving into a block with only one escape stair.
It should be noted that the changes are to the guidance, not the Building Regulations themselves. The overarching (some would say vague) legal requirements for fire safety in Part B of the Building Regulations have remained unchanged for a number of years. So, theoretically, it would be legal to construct a block of flats over 18 m high with a single escape stair even after the transition period is over. But as any such building would be classified as a relevant building, it would be subject to checks by the Building Safety Regulator (BSR) at Planning Gateway One (PGO). Even for a PGO application made today, the BSR would consider a range of fire safety issues including the number of escape stairs. Also, such a building would also be classified as a higher-risk building, so the building control body would be the BSR, who would need to approve the building before construction starts (Gateway Two) and again at completion (Gateway Three).
The amendment note, together with the current Part B Approved Documents, can be downloaded from https://www.gov.uk/government/publications/fire-safety-approved-document-b.
A BSRIA topic guide, giving a brief overview of Building Regulations, can be downloaded here.
BSRIA runs training courses on Building Regulations. More information can be found here.
This article appears on the BSRIA news and blog site as 'New Building Regulations Guidance: The Second Staircase' April 2024.
--BSRIA
[edit] Related articles on Designing Buildings
- 2022 changes to fire safety guidance and building regulations.
- Alternative escape route
- AT Building Safety Hub.
- Building evacuation.
- Escape route.
- Evacuating vulnerable and dependent people from buildings in an emergency FB 52.
- Exit passageway.
- Fire door.
- Firefighting route.
- Means of escape.
- Protected escape route.
- Protected stairway.
- Raising the bar.
- Reform of building safety standards.
- Second staircase rule halts east London housing mid-build.
- Setting the bar.
- Storey exit.
- The Regulatory Reform (Fire Safety) Order 2005.
- Unprotected escape route.
- Width of doors stairs and escape routes.
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.