BREEAM External lighting
Contents |
[edit] Aim and benefits
The aim of this credit is to encourage the installation of energy efficient lighting for external areas.
This issue offers the following potential benefits to end users and clients:
- Reduced energy costs due to higher efficiency lighting.
[edit] When to consider
RIBA Stages 3-4 (Developed Design-Technical Design)
[edit] Step by step guidance
- Request confirmation on whether there is external lighting present.
- If there is, provide the design team with the design criteria for compliance.
- Request evidence (see section below) to demonstrate compliance at the design and post construction stages.
[edit] Questions to ask while seeking compliance
- Does the building have external areas which require external lighting?
- Is the building an infill building on an existing site or an extension to an existing building?
- Will there be any areas with intermittent pedestrian traffic?
[edit] Tools and resources
External lighting - Top 10 easy win issue
https://kb.breeam.com/section/new-construction/uk/2014-uk/energy-breeam_uk_nc_2014/ene03/
[edit] Tips and best practice
- Double-check that the manufacturers’ product datasheets provide all the required information and match up to the specification provided on any drawings showing external lighting.
[edit] Typical evidence
[edit] Design Stage Evidence
A site plan indicating external lighting (both locations of light fittings and types), accompanied by manufacturers’ product datasheets for each external light fitting. A schedule of external lighting and calculations for the average lumens per circuit watt may also be provided.
[edit] Post Construction Stage Evidence
As Built issue of the external lighting plan, and confirmation of any changes to the external lighting specification since design stage.
Whilst on site, take photographs of the external light fittings, any PIR sensors and photocells/timeclocks as required.
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- BREEAM UK New Construction 2014
- BREEAM UK Refurbishment and Fit-out 2014
- BREEAM International New Construction 2016
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Tom Blois-Brooke 16:21, 01 Jul 2019 (BST)
--Elisa Caton 12:35, 06 Mar 2018 (BST)
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.