Ripping ground
In relation to civil engineering, the term ‘ripping’ refers to the loosening of soil, rock or frozen ground by drawing a forked or pronged implement through it.
Ripping (or deep ripping / deep tillage) is also used in agriculture to break up ground for crop planting.
Ripping can be carried out by tractors with rear-mounted rippers or by simple ripper or ‘blade’ attachments for excavators that can provide an alternative to hydraulic breakers.
A 'subsoiler' is similar to a ripper but often with wings on the foot of the tines to increase soil heave and shatter. Ref The HS2 London-West Midlands Environmental Statement, Glossary of terms and list of abbreviations, DETR 2013.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 July
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.

















