Ripping ground
In relation to civil engineering, the term ‘ripping’ refers to the loosening of soil, rock or frozen ground by drawing a forked or pronged implement through it.
Ripping (or deep ripping / deep tillage) is also used in agriculture to break up ground for crop planting.
Ripping can be carried out by tractors with rear-mounted rippers or by simple ripper or ‘blade’ attachments for excavators that can provide an alternative to hydraulic breakers.
A 'subsoiler' is similar to a ripper but often with wings on the foot of the tines to increase soil heave and shatter. Ref The HS2 London-West Midlands Environmental Statement, Glossary of terms and list of abbreviations, DETR 2013.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Fire performance of thermal insulation
Flat roof assemblies with PV.
Become a Professional Development Partner
CIOB launches a new framework for staff development and chartered membership.
Dorset's first conservation campaigner?
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
















