Retrospective planning permission
Planning permission is the legal process followed in order to decide whether proposed developments should be allowed to go ahead. Responsibility for planning permissions lies with local planning authorities (usually, the planning department of the district or borough council).
Other than permitted developments, (which are considered to have insignificant impact), all developments require planning permission.
It is possible to apply for retrospective planning permission after works have begun. The local planning authority will then consider the application in the same way that they would any other application. Retrospective permission may be granted, however, there is a very serious risk that permission will not be granted and then enforcement action may be taken. This could include modifying completed works, or returning the development to its previous ‘permitted’ state. Appeals can be made to the planning inspectorate.
Planning enforcement is the process of investigating and resolving possible breaches of planning law. Breaches might include:
- Not obtaining planning permission for works that require permission (including; listed buildings, satellite dishes, advertisements, protected trees and so on).
- Not carrying out works in accordance with a permission.
- Not complying with planning conditions or other limitations.
- Changing the use of a site or buildings without obtaining planning permission where planning permission is required.
Local planning authorities have discretionary power to investigate and enforce these breaches using whatever enforcement action may be necessary in the public interest. One possible enforcement action is to ask the party in breach to make a retrospective planning application if they have not already done so. However, permission may still then be refused.
On 6 April 2012, the Localism Act 2011 made changes to planning enforcement to tackle abuse of retrospective planning applications:
- Planning authorities can decline to determine retrospective applications after an enforcement notice has been issued.
- Limits have been introduced to the right of appeal against an enforcement notice after a retrospective planning application has been submitted, but before the time for making a decision has expired.
- Limiting appeals on technical grounds resulting in the granting of planning consent.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Avoiding planning permission pitfalls.
- Listed buildings.
- Localism Act.
- National Planning Policy Framework.
- National Planning Practice Guidance.
- Permitted development.
- Planning appeal.
- Planning authority.
- Planning conditions.
- Planning enforcement.
- Planning obligations.
- Planning permission.
- Regularisation.
[edit] External references.
- House of Commons Library, Enforcement of Planning Law. 16 July 2013.
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.