Rescheduling
The CIOB Planning Protocol 2021 (CIOB PP21), a technical information sheet published by the Chartered Institute of Building (CIOB) in February 2021, defines rescheduling as: ‘a mathematical calculation performed by the planning software utilised to calculate the minimum possible time for completing the project / programme and the float present. It is based on the progress, logic and constraints within the programme.’
[edit] Related articles on Designing Buildings Wiki
- Accepted programme.
- Activity schedule.
- As-built programme.
- CIOB articles.
- Contractor's master programme.
- Contractor's working schedule.
- Critical path.
- Design programme.
- Information release schedule.
- Programme for building design and construction (project programme).
- Programme.
- Schedule.
- Stress test.
- Short period programme.
- Tender works programme.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.