Unplanned maintenance
NRM3: Order of cost estimating and cost planning for building maintenance works, defines ‘unplanned maintenance’ (or unscheduled or reactive maintenance) as: ‘…reactive and non-emergency work activities that occur in the current annual programme (i.e. maintenance carried out to no predetermined plan). Activities may range from unplanned/unscheduled maintenance of a nuisance nature requiring low levels of skill for correction, to non-emergency tasks involving a moderate to major repair or correction requiring skilled labour.’
Business-Focused Maintenance (BG 53/2016), written by Jo Harris and published by BSRIA in May 2016, states: ‘Reactive or unplanned maintenance is the ad-hoc, unscheduled repair or replacement of assets when they fail. It can be cost-effective for non-critical assets to be run to failure, but the unpredictable nature of the work makes it difficult to manage for essential assets unless the response time can be reliably implemented.’
[edit] Related articles on Designing Buildings
- Building owner's manual.
- Business focused maintenance.
- Facilities management.
- How to manage construction plant.
- In-house or outsource maintenance.
- Maintenance.
- Predictive maintenance.
- Preventative maintenance.
- Proactive maintenance.
- Reliability centred maintenance.
- Resource management.
- RICS.
- Scheduled maintenance.
- Soft landings.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.