RB12, Rio de Janeiro
In May 2016, renovation works were completed on a Rio de Janeiro office block that aims to become a model for how the city's existing building stock can be upgraded and made more environmentally friendly.
The French-Brazilian studio Triptyque worked on revamping the 85 m-high office block RB12, as part of Porto Maravilha, the regeneration of the port area ahead of the summer's Olympic Games.
Rather than demolish the building, property developer Natekko commissioned Triptyque to design ways of making the building greener.
Part of their concept was to fit the 26-storey façade of the narrow building with innovative zigzagging glass panels and louvres, helping reduce sun exposure and allowing the glazing to 'play with light like a diamond'. The studio has called this a 'bioclimatic façade'.
The introduction of natural ventilation has improved the internal climate on the building's 21 office floors. All accessed via a spacious ground floor lobby, these floors each have a cranked plan that naturally divides the spaces into two sides.
Plant-covered balconies were also installed, irrigated by water from a new rainwater harvesting system which is also used for flushing toilets. Solar photovoltaic panels were added to much of the north-facing side wall, allowing the building to generate its own electricity and sell any energy not used back to the grid. Triptypque claims this is the first of its kind for a commercial building in Brazil.
"[It] embodies an innovative new concept of sustainable development based on energy production, thus following the global trend of green refurbishment, which consists in adapting and upgrading old buildings," they said.
Images courtesy of Leonardo Finotti.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Alexander Tower, Berlin.
- Allowable solutions.
- Arapiraca, Sao Paulo.
- Arches Boulogne, France.
- Code for Sustainable Homes.
- Community energy network.
- Conservation and storage facility for the Musée du Louvre.
- Glazing.
- Maggies Cancer Centre, Manchester.
- Make Buildings Better.
- Oasia Hotel Downtown, Singapore.
- Renewable energy.
- Renovation v refurbishment v retrofit.
- Retrofit.
- Skyfarm.
- Sustainability.
- Toronto Tree Tower.
Featured articles and news
Just one month until the changes to part L come into effect.
Not forgetting part F and the new part overheating part O.
Heat Pump demand rises by one quarter.
As energy prices jump up in cost.
With people in the UK from Ukraine.
Industry leader Steve Murray takes on role.
An abundant and versatile building material.
How overheating complicates ending gas in the UK.
600,000 heat pump installations targeted per year by 2028.
Cost planning, control and related articles on DB.
Helping prevent those unwanted outcomes.
ICE debate Public transport - post pandemic.
How has transport changed due to Covid-19 ?
Cross-ventilation in buildings. Do you have it ?
Will you need it ? after June 15 and the new Part O ?
Share your knowledge with the industry.
Create an account and write the first of many articles.
The green jobs delivery group.
CIAT commentary after the first meeting.
Liverpool's world heritage site status
Who is to blame?
Research recommends focussing on portfolio success rather than project success.
ICE and BSI launch revised PAS 128 standard.
The revised standard for mapping underground utilities.
Launching the UK net zero carbon buildings standard.
Cross-industry steering group seeks support in delivery.