Project strategies
The RIBA Plan of Work 2013 defined Project Strategies as:
|
The strategies developed in parallel with the Concept Design to support the design and, in certain instances, to respond to the Final Project Brief as it is concluded. These strategies typically include:
These strategies are usually prepared in outline at Stage 2 and in detail at Stage 3, with the recommendations absorbed into the Stage 4 outputs and Information Exchanges. |
The RIBA Plan of Work 2020 defines Project Strategies as:
|
Strategies to support the design process, generally developed in parallel with the
These strategies are usually prepared in outline at Stage 2 and in detail at Stage 3, |
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.