Maintenance and operational strategy
The RIBA Plan of Work 2013 defines the Maintenance and Operational Strategy as: ‘The strategy for the maintenance and operation of a building, including details of any specific plant required to replace components.’
The RIBA Passivhaus Overlay, published by the RIBA in 2022, states in relation to maintenance and operational strategies: “These define how systems will be maintained and by whom, and should also cover commissioning and user guidance. The maintenance and operational requirements of various systems inform and influence the initial project brief. Therefore, knowing who and how systems will be maintained, and filters will be changed, impacts upon the location and space planning of the mechanical ventilation heat recovery units. Also, to assist with the measurement, calibration and commissioning of building services equipment, a Commissioning Plan and Programme should be developed, reviewed, updated, and implemented by the project team. Commissioning may be undertaken at various points prior to completion – to allow fault finding/remediation – and then at agreed intervals during the defects liability period (and later) – to verify that the systems comply with the construction documents/contract and design intent. More broadly, to support the daily use and operation of the building, appropriate guidance for each user group should be provided in the form of a quick start user guide. Refer to RIBA Plan for Use for supporting information.”
[edit] Related articles on Designing Buildings
Featured articles and news
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.




















Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.