Plenums are air compartments or chambers that are sometimes found in buildings, either above suspended ceilings, in the gap between the ceiling and the floor slab, or below raised floors in the gap between the raised floor and the floor slab. They form part of the ventilation system for the building.
They may be supply or return plenum, and may serve either an entire building, or a specific zone in a building. Supply plenum supply ventilation air to the occupied space, whilst return air is generally extracted through ductwork. Conversely, in return plenum the air is generally ducted to the space, whilst the return air is extracted through the plenum.
Plenum can be combined with thermal mass to help moderate peak conditions, or to allow night time purging. See thermal mass for more information.
Underfloor air distribution (UFAD) uses the underfloor plenum beneath a raised floor to provide ventilation air through floor diffusers directly to the occupied zone. The air spreads across the floor forming a reservoir of fresh, cool air. Any sources of heat (such as people or computers) generate a thermal plume lifting contaminated air to high level where it can be removed from the space. See Underfloor air distribution for more information.
Plenum can give good flexibility for the layout of buildings. However, they can provide a space within which fire can spread, particularly because of the air supply they offer, and so they may be required to include fire and smoke detection, and potentially combustible material (such as cables) may be controlled. They can also create a pathway for the transmission of sound between separate spaces.
The inclusion of dampers and acoustic attenuators can be beneficial, but this results in pressure losses. Good air-tightness is required to the plenum construction to optimise performance.
It is important to ensure that spaces above suspended ceilings and below raised floors do not inadvertently become plenum as a result of the disconnection of, or damage to ductwork.
NB the phrase ‘open plenum’ can be used to describe buildings in which there is no suspended ceiling, but instead the floor slab and services are exposed giving an ‘industrial’ look.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Active thermal mass.
- Air handling unit.
- Chilled beam.
- CIBSE Case Study Olympic Velodrome.
- CIBSE Case Study Ortus Learning and Events Centre.
- Ground preconditioning of supply air.
- Herringbone strut.
- HVAC.
- Floating floor.
- Floor plenum airtightness.
- Mechanical ventilation.
- Night time purging.
- Raised floor.
- Sprung floor.
- Suspended ceiling.
- Thermal labyrinth.
- Thermal mass.
- Underfloor air distribution
- Ventilation.
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.