Original design manufacturer
ODM stands for Original Design Manufacturer. In this model, the manufacturer not only produces the product but also designs it. The client can either accept the existing design or make slight modifications before selling the product under their own brand. This model is particularly appealing to companies with limited design resources or those looking to launch products quickly.
Advantages of ODM:
- Since the design phase is largely handled by the manufacturer, the time to market is significantly reduced, allowing businesses to respond swiftly to market demands.
- ODM generally involves lower initial investment since the design and development are managed by the manufacturer, making it a cost-effective option for startups and small businesses.
- With ODM, businesses can rely on the manufacturer’s expertise and experience, reducing the risks associated with design flaws or production issues.
Challenges of ODM:
- The level of customisation in ODM is often constrained by the pre-existing designs offered by the manufacturer, which may not fully align with the client’s brand or market needs.
- In many cases, the ODM retains the IP rights to the design, which can be a concern for businesses that prioritise IP ownership and protection.
[edit] Related articles on Designing Buildings
- Circular economy.
- Construction waste.
- Disposal.
- Embodied energy.
- End of life.
- End of use.
- Equipment.
- Manufacturer.
- OEM vs ODM: A Comparative Guide for Product Development Success.
- Original Equipment Manufacturer.
- Pre-demolition audit.
- Recycling.
- Refurbishment.
- Reuse.
- Reused construction products.
- Service life
- Upcycling.
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.





















