Original design manufacturer
ODM stands for Original Design Manufacturer. In this model, the manufacturer not only produces the product but also designs it. The client can either accept the existing design or make slight modifications before selling the product under their own brand. This model is particularly appealing to companies with limited design resources or those looking to launch products quickly.
Advantages of ODM:
- Since the design phase is largely handled by the manufacturer, the time to market is significantly reduced, allowing businesses to respond swiftly to market demands.
- ODM generally involves lower initial investment since the design and development are managed by the manufacturer, making it a cost-effective option for startups and small businesses.
- With ODM, businesses can rely on the manufacturer’s expertise and experience, reducing the risks associated with design flaws or production issues.
Challenges of ODM:
- The level of customisation in ODM is often constrained by the pre-existing designs offered by the manufacturer, which may not fully align with the client’s brand or market needs.
- In many cases, the ODM retains the IP rights to the design, which can be a concern for businesses that prioritise IP ownership and protection.
[edit] Related articles on Designing Buildings
- Circular economy.
- Construction waste.
- Disposal.
- Embodied energy.
- End of life.
- End of use.
- Equipment.
- Manufacturer.
- OEM vs ODM: A Comparative Guide for Product Development Success.
- Original Equipment Manufacturer.
- Pre-demolition audit.
- Recycling.
- Refurbishment.
- Reuse.
- Reused construction products.
- Service life
- Upcycling.
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.