Glass blowing
Stained Glass Windows: Managing Environmental Deterioration, published by Historic England in 2020, suggests that glass blowing is a: ‘Glass-forming technique, probably developed in Babylonia and the Middle East by the 1st century BC. Molten glass is gathered into a ball on the end of a hollow pipe, and rolled on an iron former to roughly shape it and to slightly cool the surface. Then the pipe is used to blow air into the glass and form it into a bubble. By repeated blowing, shaping and reheating, the glass can be formed in many ways.’
Archaeological Evidence for Glassworking, Guidelines for Recovering, Analysing and Interpreting Evidence, published by Historic England in 2018, defines a blowing iron as: ‘A long iron tube that was dipped into the molten glass to collect a gather for subsequent inflating and shaping.’
It defines optic blowing as a process in which: 'A gather of glass is blown into a mould with a pattern on the inner surface, which transfers to the glass. Continued free blowing results in movement and distortion of the pattern.'
And overblow as: 'A by-product of mould blowing, referring to the glass that remains outside the mould, which is removed and recycled.'
It defines paraison as: 'The partially inflated gather of glass at the end of the blowing iron.'
And paraison end as: 'A marble-shaped blob of glass pinched from the end of the gather during the blowing of particular forms, such as the bowls of goblets.'
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.

















