The term 'metal furring system', or MF system, refers to a non-structural metal attachment that is used to hold a finish material, often used as a technique for creating a seamless plaster internal finish with a void behind for the installation of services, with plasterboard fixed directly to the concealed metal furrings. It can be used as an alternative to traditional timber batten construction for walls and ceilings.
In metal-framed construction, the furring pieces are long, light gauge materials (usually 25 or 20 ga.) of various shapes, often used to hold insulation or other construction items between materials. Due to the light gauge, a certain amount of rigidity is provided by the bends that create the cross section shapes.
A ‘hat’-shaped bent metal is the most common type of metal furring. This is used to secure the outer layer of material where it would be difficult to insert attachments such as screws and nails.
A ‘z’ furring is attached to one surface at the bottom flange, accepting an outer layer of material to be attached to the other flange. This is often used in commercial and residential buildings as a spacer, allowing an existing wall surface to be insulated, or allowing horizontal electrical or plumbing components to be installed and covered with a finish material.
A variety of fastening methods can be used with a metal furring system. Screws are the most common and easiest, although when the furring strip is attached directly to concrete, masonry or structural steel, more specialised fasteners are used such as sleeve type anchors, course thread anchors, power actuated pin fasteners, and so on.
[edit] Related articles on Designing Buildings
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief exoplanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.