Temporary flooring options
If you’re faced with an uneven ground surface and don’t want to go to the expense of having a permanent base laid for a temporary solution, there are a number of temporary flooring options.
The budget option is to have a plastic portable floor (similar to those used at festivals and events to create pathways), which simply lays to your existing surface like this one which was installed at the temporary cruise line baggage hall at Liverpool.
This system works well on level surfaces and is capable of withstanding 2.5tonne forklift trucks. It’s also very quick to install and relatively cheap to hire.
The biggest downside with this type of floor is it can lift in extreme heat (which we don’t get a lot of in the UK) and of course, if you get any water ingress due to sloping ground, the water will run across the top of the portable floor.
A better option can be a ‘heavy-floor’ system which is designed to level the ground and has the added benefit of acting as the base for the temporary building, so there is no need to penetrate the ground to anchor the building into place.
The image above, shows a temporary building installed on top of a ‘heavy-floor’ on a grassed area.
These are used extensively when temporary buildings are supplied to power stations and oil refineries when they are used as site workshops and offices.
It can also be used for car show rooms and retail areas as seen here, at a temporary Pret-A-Manger coffee lounge.
The best feature of this floor is that as it is a sub-structure system, it lifts the entire building off the existing ground surface, so any water runs underneath and it guarantees a level surface.
It is limited in its weight baring capacity to 500kg’s m² so it is not feasible to use it for fork lift trucks or heavy palletised goods.
It is possible to run a pump truck across it, so providing fork lift access is not needed, this floor system is a very fast and effective way to create a solid level base, when the existing ground surface is either too uneven or there is only a grassed or hardcore area.
In some situations a raised concrete base might be better, but if the intention is only to use the temporary building for a few months, as opposed to years, then a new concrete base would probably be cost prohibitive.
Author bio: Sophia writes for Smart Space, Britain’s leading specialist in flexible building solutions since 1985.
[edit] Related articles on Designing Buildings
Featured articles and news
Tackle the decline in Welsh electrical apprenticeships
ECA calls on political parties 100 days to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.