Hold harmless agreement
A hold harmless agreement is a clause typically included in construction contracts, in order not to hold one party liable for the acts of the other. It can be a unilateral or reciprocal agreement and is commonly provided by a subcontractor to the main contractor.
The provisions of such an agreement mean that the risk of being held liable for loss or damage due to the actions of another are minimised and a claim for indemnity can be pursued. In terms of a reciprocal agreement, both parties are covered, i.e. the subcontractor will not be held liable for loss or damage caused by the main contractor and vice versa.
The protection provided by the agreement varies according to the jurisdiction, but in general, they must include an express indemnification, that is, a written agreement that secures or protects a person/party from the legal responsibility of a loss. The named party who that takes responsibility is known as the ‘indemnitor’ while the named party to be protected is known as the ‘indemnitee’.
There are three basic types of hold harmless agreements:
- Broad form: This type holds that the indemnitor will assume all risk for liability regardless of whether responsibility lies with the indemnitee.
- Intermediate form: This is the most commonly used type and holds that the indemnitor will assume all risk for liability unless responsibility lies solely with the indemnitee.
- Limited form: This type holds that the indemnitor will only assume the risk of liability for loss caused by their own actions.
Key features of a hold harmless agreement include:
- Indemnification: The party providing the hold harmless (the indemnitor) agrees to compensate the other party (the indemnitee) for any losses, damages, or legal costs that arise from specific circumstances outlined in the agreement.
- Scope of Protection: Specifies the types of claims or liabilities covered, such as personal injury, property damage, or financial losses related to the construction project.
- Duration: Defines the period during which the hold harmless provisions apply, which could be during the construction phase or extend beyond project completion.
- Exclusions: Identifies any exclusions or limitations to the hold harmless provision, such as negligence or willful misconduct by the indemnitee.
Common scenarios for hold harmless agreements include:
- A contractor may agree to hold the client harmless for any claims arising from the contractor's work, such as accidents or property damage occurring on-site.
- A subcontractor might agree to indemnify the main contractor against any liabilities resulting from the subcontractor’s actions or omissions.
- A supplier may provide a hold harmless agreement protecting the contractor from claims related to defective materials or equipment supplied.
The terms of hold harmless agreements are often heavily negotiated to balance the interests and risk tolerance of both parties. The enforceability of hold harmless agreements can vary depending on the specific wording and circumstances. Courts may scrutinise these clauses, especially if they appear overly broad or unfair. It is essential for parties to have appropriate insurance coverage to back up their indemnity obligations.
[edit] Related articles on Designing Buildings
Featured articles and news
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.