Gaia Building, Ecuador
Completed at the end of 2016, the Gaia Building has been heralded as a new landmark for the Ecuadorian capital of Quito. Designed by Leppanen + Anker Arquitectos, the building uses an innovative moulded façade system.
Creating 15,000 sq. m of mixed-use space, and topped with a large roof garden, the 15-storey tower provides a combination of commercial, office and residential units.
The building uses a repeating pattern to reduce the number of moulds used in forming the distinctive glass fibre reinforced concrete (GFRC) façade.
The benefits of this sinuous façade material include the efficiency and ease of its installation. A system of adjustable metallic connections allows easy alignment of the complex forms, and the 4m panels can be reused.
As the first new construction in the neighbourhood, the intention behind the design was to combine diverse elements to produce a ‘play of light and shadow of the surroundings’. Carved around the perimeter are deep balconies, intended to help reduce solar gain allow large glazing sections to be used without reducing the efficiency of the passively-controlled internal spaces.
[All images © Sebastián Crespo]
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
50th Golden anniversary ECA Edmundson apprentice award
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
Construction contract awards down one billion pounds
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.