Fresco
A fresco is a type of mural painted direct onto wet plaster so that the paint becomes an integral part of the surface finish. The word ‘fresco’ is derived from the Italian ‘fresh’.
Frescos (or frescoes) were made as early as 1500 BC, with many examples in Knossos in Crete. The technique was developed in Italy during the thirteenth century, and became popular during the Renaissance.
It involves plastering a wall or ceiling a section at a time, with each section equivalent to the area that can be painted in one day. A water-based paint (made by mixing dry-powder pigments and water) is then applied to the wet plaster, which absorbs it, making it less likely to flake or rub off. The joints between sections of frescos follow clear lines of division within the image so they are not apparent in the completed work.
Frescos have a matte finish, and if they are kept clean and dry, can last for hundreds of years. However, they must be painted very quickly, mistakes are difficult to correct, they cannot be moved, and gases emitted by the drying plaster can be noxious.
Paintings on made on dry plaster, such as those at Pompeii, are not true frescos and are sometimes referred to as secco (dry) fresco.
Perhaps the most famous fresco is the ceiling of the Sistine Chapel by Michelangelo, which took 4 years to complete between 1508 and 1511 and made the artist ill.
By the mid-16th century oil painting had become more popular than fresco painting, as there are fewer technical challenges, it is possible to achieve a gloss, translucent finish, and the painting can be moved.
[edit] Related articles on Designing Buildings
Featured articles and news
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.



























