Fee for intervention FFI
In 2012, the Health and Safety Executive (HSE) introduced a fee for intervention (FFI) scheme which allows them to charge companies where safety breaches are found. If the HSE undertakes inspections and no material breaches are found, or the company is compliant, no charges are made.
An independent review of the fee for intervention scheme was undertaken in 2013 which found that its application had been successful and there was no ‘viable alternative’ which could meet the aim of shifting the cost of regulating work place health and safety away from the taxpayer to those who break the law.
It is only necessary for a charge to be levied on a company when a material breach is found. This is considered to be where there has been a contravention of health and safety law that requires a notice in writing to be issued.
The fee for intervention is applicable to all dutyholders where the HSE is the enforcing body. This includes:
- Employers.
- Self-employed individuals who may put others at risk.
- Individuals acting in a capacity other than as an employee, such as partners.
- Public and limited companies.
- Crown and public bodies.
- General, limited and limited liability parternships.
A material breach of the law is charged at £154 per hour and the total number of hours charged is based on the time it takes to identify the breach and remedy it.
In October 2015 it was reported that invoices issued to construction companies under the scheme for costs recovery had increased by 40% in the three years since it was introduced. See 40% increase in HSE cost recovery invoices for more information.
In September 2016, OCS Group won the right to a judicial review of the way the HSE handles FFI appeals, on the basis that they are acting as prosecutor, judge and jury.
In January 2017 it was revealed that fees had reached £15m in 2016, up 23% on the year before.
Also in January 2017, it was reported that the nature of the scheme would be questioned at a judicial review brought by facilities management firm OCS. This is seen as an attempt to have the fees bill overturned and the system for deciding appeals quashed.
In February 2017, proposals were put forward for an impartial body to rule on disputes over fees. An HSE spokesperson said; “HSE has always kept the dispute process under review and following a recent application for a judicial review we believe the time is right to move to a dispute process which is completely independent of HSE.”
In March 2017, it was reported that changes would include; a right for dutyholders to obtain evidence used by HSE; an independent appeals panel and a right to make submissions to the appeals panel. The changes must be in place by 1 September 2017 to avoid further court action.
In April 2017, HSE began a consultation into the proposed changes. The consultation closed on 2 June 2017. Following the consultation, HSE launched a revised process for considering disputes of invoices issued under the fee for intervention scheme. This involves all disputes being considered by a panel independent of HSE.
[edit] Related articles on Designing Buildings Wiki.
- Asbestos.
- CDM Regulations.
- Health and safety offences, corporate manslaughter and food safety and hygiene offences definitive guideline.
- COSHH.
- Deleterious materials.
- Demolition.
- HSE land use planning pre-application advice service.
- Health and safety.
- Health and safety inspector.
- Notify HSE.
- Reporting accidents and injuries on construction sites.
- Statutory consultee.
Featured articles and news
Delivering for tenants; National Retrofit Hub
New report offers recommendations to strengthen energy efficiency standards to protect private renters.
Government consultations for the summer of 2025
A year of Labour, past and present consultations on the environment, the built environment, training and tax.
CMA competitiveness probe of major housing developers
100 million affordable housing contributions committed with further consultation published.
Homes England supports Greencore Homes
42 new build affordable sustainable homes in Oxfordshire.
Zero carbon social housing: unlocking brownfield potential
Seven ZEDpod strategies for brownfield housing success.
CIOB report; a blueprint for SDGs and the built environment
Pairing the Sustainable Development Goals with projects.
Types, tests, standards and fires relating to external cladding
Brief descriptions with an extensive list of fires for review.
Latest Build UK Building Safety Regime explainer published
Key elements in one short, now updated document.
UKGBC launch the UK Climate Resilience Roadmap
First guidance of its kind on direct climate impacts for the built environment and how it can adapt.
CLC Health, Safety and Wellbeing Strategy 2025
Launched by the Minister for Industry to look at fatalities on site, improving mental health and other issues.
One of the most impressive Victorian architects. Book review.
Common Assessment Standard now with building safety
New CAS update now includes mandatory building safety questions.
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.