Artificial ground
Artificial ground can be classified as:
- Made ground: Areas where material is known to have been placed by man on the pre-existing (natural or artificial) land surface (including engineered fill). For more information see: Made ground.
- Infilled ground: Areas where pre-existing (natural or artificial) land surface has been excavated (worked ground) and subsequently partially or wholly backfilled.
- Worked ground: Areas where the pre-existing material (natural or artificial) land surface is known to have been excavated by man.
- Landscaped ground: Areas where the pre-existing land surface (natural or artificial) has been extensively remodelled, but where it is impracticable to delineate separate areas of made ground, worked ground or disturbed ground.
- Disturbed ground: Areas of ill-defined surface disruption associated with surface or near-surface development or collapse. The disturbance is typically complex, dominated by zones of subsidence, and includes areas of worked ground and made ground.
Ref British Geographical Society rock classification scheme.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Sir Edwin Lutyens: Britain's greatest architect? Book review.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.