Unregistered design rights
Rights that protect unregistered designs and stop others from using them without permission are known as a ‘design right’. It gives protection automatically without paying a fee, this protection differs depending on the nature of the unregistered design.
Design rights relating to the shape and configuration of an unregistered design lasts either 10 years after and item was first sold or 15 years after it was created, whichever ends first. However within the last 5 years of protection if a ‘licence of right’ is requested one must let others use the design. A registration for longer protection can however be applied for providing the design meets certain eligibility criteria.
Design rights relating to the appearance of a product is protected in the UK for 3 years from the date the design is made public. Known as ‘supplementary unregistered design right’ (or ‘continuing unregistered community design’ if made public in the UK or the EU before 1 January 2021). The rights relating to appearance can refer to 2-dimensional or 3-dimensional designs including; shape, colours, texture, materials or ornamentation.
If a design is made public in the EU, it’s protected in the EU for 3 years from the date it was made public and is known as ‘unregistered community design right’, but it does not protect the design outside the EU. If made public before 1 January 2021, it remained protected in the EU until the end of the 3 year period and protected whether made public in the EU the UK.
Proof of when a design was created is needed in order to prove the right that a design is protected. This could mean getting signed and dated copies of the design drawings or photos certified and kept by a solicitor or intellectual property attorney. There are other ways to prove your right. You’ll usually need to get professional legal advice. Others can use a design if the original proven designer sells or gives a licence of right. Disputes over a design and use thereof should be directed to the Intellectual Property Office (IPO), intellectual property professionals may charge for their assistance.
[edit] Related articles on Designing Buildings
- Appointing consultants.
- Assignment.
- Building component.
- Concept design.
- Concept..
- Confidentiality clause.
- Copyright.
- Design coordination.
- Design management.
- Design methodology.
- Design principles.
- Design protection.
- Detailed design..
- Design protection.
- Manual drafting techniques.
- Mood board.
- Non-disclosure agreement.
- patents.
- Prejudice to commercial interests.
- Proprietary information.
- Royalties.
- Trade secrets.
- Trade mark.
- Truth to materials.
- UK consults on proposals to give creative industries and AI developers clarity over copyright laws
- What is design?
[edit] External links
Featured articles and news
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.





















