Consultant team start-up meeting
A consultant team start-up meeting should be held when members of the consultant team are appointed, before they begin work. It should be chaired by the client and attended by the consultant team. It is possible that consultants will not all be appointed at the same time, so it may be necessary to hold more than one start-up meeting.
The start-up meeting is an opportunity to:
- Introduce the parties to be involved, explain responsibilities and exchange contact details.
- Describe the organisational structure that will be adopted.
- Issue and discuss site information.
- Issue and discuss the preliminary business case (if appropriate).
- Issue and discuss the strategic brief.
- Issue and discuss the project execution plan.
- Agree working methods such as; methods of communication, means for reporting, approvals and decision making processes (consultants can sometimes programme client decisions into their work without first establishing that the programme suits the client), drawing protocols and standards, collaborative practices, document control strategies and so on.
- Discuss procurement options and tendering restrictions (such as OJEU procurement rules).
- Discuss CDM and other legislative obligations.
- Identify any additional members of the consultant team, specialist designers, specialist contractors or independent client advisers who should be appointed.
- Discuss the programme.
- Identify immediate tasks to be undertaken.
- Agree meeting schedules.
- Discuss the application of VAT.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.